Cable tray load calculator

Add the cables that will lie on the tray, from 4 core armoured power cables to Cat6, and the run length: the tool gives the load in kg per metre from published cable masses, the width they take in one layer, the supports at your spacing and a check against the tray's safe working load.

Galvanised perforated cable tray on wall brackets in a warehouse, carrying black armoured cables tied down in neat rows

CALCkg/mCable load on the tray. Ask for the load table

Cable load on the tray
Tray load and supportsruns in your browser
Cable load
-
Load between two supports
-
Width in one layer
-
Tray lengths
-
Supports for the run
-
Against the tray's rating
-

Cable masses come from cable makers' data sheets (kg/km / 1000). Supports = run / spacing, rounded up, plus one at the far end. Our starting spacing is 1.5 m, the close end of the usual 1.5 to 2 m; the real limit is the safe working load in the tray maker's table for that width and span, which falls fast as the span grows. Brackets and fixings carry the tray's own weight too. Metal tray is earthed by the electrician.

A tray that sags between brackets has usually been loaded past its span, not built badly. This calculator weighs the cables before they go up: pick each cable, give a count, and it adds up the kilograms per metre from cable makers' data, checks the width they need in one layer and counts the supports along the run. Compare containment on cable tray, go heavier on cable ladder, or price the run with the trunking cost estimator.

Load per metre and per span

Armoured cable is heavy. A 4 core 16 mm² SWA cable weighs about 1.77 kg a metre and 4 core 95 mm² about 6.1 kg, while a Cat6 cable is under 0.04 kg. Ten 16 mm² cables put about 17.7 kg on each metre of tray. At supports 1.5 m apart, each span carries about 26.5 kg, and a 30 m run needs 21 brackets. The tool shows the load per metre, the load between two supports and the count.

Checking against the tray

Tray makers publish safe working loads in kg per metre for each width at each support span, and the figure falls quickly as the span grows. We found no published table we could use for all trays, so the tool asks for the figure from your supplier's table and compares. Our starting span is 1.5 m, the close end of the usual 1.5 to 2 m; change it to match the table. Brackets, threaded rod and the fixings into the slab must carry the same load.

Width and the second layer

  • Laid in one layer, the ten 16 mm² cables need about 260 mm, so a 300 mm tray.
  • Power cables in one layer lose heat better; stacking them may need derating, which the electrician works out.
  • Keep data on its own tray or behind a divider.
  • Metal tray must be bonded to earth by the electrician.

Frequently asked questions

Does the tray's own weight count?
Makers' load tables usually give the load the tray can carry on top of its own weight, but check the note on the table. Brackets and hangers carry both, so add the tray's mass when sizing them.
When should I use ladder instead of tray?
For heavy power cables over long spans, such as in a plant room or up a riser. Ladder spans further between supports and lets large cables cool. The supplier's tables show where tray stops making sense.
My cable is not in the list.
Pick the closest size, or take the mass in kg/km from the cable's data sheet and divide by 1,000 for kg per metre. Data sheets list it for every size.
Who can supply and install the tray?
Send a request and tray suppliers, electrical wholesalers and contractors near you quote directly. We pass requests on and supply nothing.

More calculators

Request cable tray quotes

Fill in the job card: what you need, the metres of run, the corners, the size and where it goes. Electrical wholesalers, trunking suppliers and installers that serve your area quote you directly. It is free and there is no obligation.

Job card 3227Cable Tray

1The job

2The run (optional, it helps the quote)

Your run, in lengthsrule of thumb

-
-
-
-
-
-
Estimate
-

A rule of thumb for the request, not a supplier's quote.

3Site, material and timing

4Your list (optional)

  1. L01
  2. L02
Up to 12 lines: lengths, fittings, fixings, labour.
Needs and options

5Your details

Free and no obligation. By sending you agree that we may share your request with suitable suppliers and installers. See our privacy policy.

Get free quotes