Get quotes

Trunking

Floor trunking: power and data under the floor, out to the desks

Free quotes from electrical wholesalers, trunking suppliers and installers across South Africa. One request, no obligation.

An open floor box with plugs and data points set into a grey carpet in an empty open plan office, desks in the background

TR-05FloorUnder screed and in floors. Power and data underfoot

Under the desks
TR-05DRG TRK-4970Under the desks

Floor Trunking: at a glance

For
Open plan offices, call centres, libraries
Fix
Ducts under screed or a raised access floor
Size
One to three compartments, box per pod
Check
Desk layout fixed before the screed pour
Quote
Duct metres, boxes, modules, cut outs, CoC
Cable schedule Floor TrunkingRev AScale NTSFree quotes, no obligation

Floor trunking carries power and data under the floor and brings it up exactly where the desks stand, so there are no cables across the walkway and no poles from the ceiling. In a new office in Midrand or Umhlanga it usually means steel or PVC ducts laid on the slab and covered by the screed, or the open void under a raised access floor, with floor boxes on top. Here is how the systems differ, why everything is decided before the screed is poured, and what to sort out about the desk layout.

Ducts in the screed or a raised floor

Underfloor trunking in the screed is a grid of flat ducts, often with two or three compartments for power, data and spare, laid on the concrete slab before the screed goes down. Junction boxes sit where ducts cross, and outlet boxes rise to floor level. It costs little floor height but it is fixed: where the ducts go is where the desks can go.

A raised access floor sits on pedestals, typically leaving a void under removable tiles. Cables lie in that void, often on wire basket tray, and a floor box can go in almost any tile. It costs height and money and wins whenever the layout will change.

Floor boxes and service outlets

  • A flush floor box has a lid that closes over the plugs, with a slot so the cords come out when the lid is down.
  • Choose the number of power and data modules per box from the desks it serves, usually one box per pod of two to four.
  • Pedestals or service poles stand on the floor where boxes cannot reach, such as an island counter.
  • Check the load rating of lids where chairs, trolleys or a pallet jack roll over them.

Plan it before the screed is poured

Once the screed is down, changing the duct route means cutting concrete. Before the pour, the site foreman, the electrician and whoever designs the furniture layout need one drawing that shows the desks, the duct grid and every box. Ask for extra outlet points along the ducts with blank covers, because the second tenant will move things. Keep power and data in their own compartments the whole way. On a raised floor, plan the tile cut outs and carpet or vinyl cut outs at the same time.

Retrofit options in an existing floor

In a finished office you can core drill to a void below, chase a channel into the screed for a single box, or use low profile floor trunking on top of the carpet along a wall. For a temporary walkway, a half moon cable cover is safer than loose cords. Often the neatest retrofit is dado trunking around the walls with desks on the perimeter.

What to put in your request

  • Attach the floor plan with the desk layout
  • Say screed ducts, raised floor or retrofit
  • Give the number of floor boxes and modules
  • Say when the screed or floor goes down
  • Mention carpet, tile or vinyl finish

Floor Trunking: who asks for them and why

  • Homeowners, landlords and DIY: a home office or kitchen island fed from a single floor box chased into the screed
  • Electricians and electrical contractors: laying duct grids before the pour and wiring floor boxes once the carpet is down
  • Offices, co-working spaces and IT teams: an open plan floor with desks in the middle and no cables across the walkways
  • Shops, restaurants, salons and malls: island counters and display tables in a showroom fed from boxes in the floor
  • Factories, warehouses, mines and workshops: inspection benches and test stations in the middle of a factory floor
  • Builders, developers and shopfitters: ducts set out on the slab with the foreman before the screed contractor arrives
  • Server rooms, data, CCTV and solar installers: network cables to call centre desks kept apart from power in their own channel
  • Schools, clinics, churches and municipalities: library reading tables, exam halls and council chambers with power at each seat

Frequently asked questions

How many floor boxes does an office need?
Work from the furniture plan: usually one box for every two to four desks, plus boardroom tables and printers. Add a few spare outlets on the duct route for when the layout changes.
Is floor trunking only for new buildings?
Screed ducts are mostly for new builds and full refurbishments. Existing offices tend to use raised floors, single chased boxes or perimeter trunking instead.
Who installs floor trunking?
The ducts are usually laid by the electrical contractor before the screed, working with the builder. The wiring and the floor box connections are done by a registered electrician, who issues the CoC.
Can I get quotes through this site?
Yes. We send your request, ideally with the floor plan and desk count, to contractors and suppliers working in your part of the country, and the prices come straight from them, not from us. The cost estimator gives a rough budget first.

Work it out first

More on trunking and cable containment

Request floor trunking quotes

Fill in the job card: what you need, the metres of run, the corners, the size and where it goes. Electrical wholesalers, trunking suppliers and installers that serve your area quote you directly. It is free and there is no obligation.

Job card 4970Floor Trunking

1The job

2The run (optional, it helps the quote)

Your run, in lengthsrule of thumb

-
-
-
-
-
-
Estimate
-

A rule of thumb for the request, not a supplier's quote.

3Site, material and timing

4Your list (optional)

  1. L01
  2. L02
Up to 12 lines: lengths, fittings, fixings, labour.
Needs and options

5Your details

Free and no obligation. By sending you agree that we may share your request with suitable suppliers and installers. See our privacy policy.

Get free quotes